Jak to funguje

Greenkote

Výrobní proces povrchové úpravy Greenkote, je difúzní proces nazývaný termo-chemická povrchová modifikace (TCSM) kde vrchní vrstva se nanáší uvnitř vyhřáté nádoby.

Kompletní informace si můžete stáhnout v PDF.

Rekonstrukce železničních stanic

Hope Station Footbridge, DerbyshirePaddington Station redevelopmentBlackfriars Bridge, LondonWhite Horse Bridge, Wembley


Hope Station Footbridge, Derbyshire

Datum dokončení: duben 2013

Hope station serves the villages of Hope and Brough in the Derbyshire Peak District. Dating back to 1894 the stations footbridge has been restored by Murphy Group. The area is notable tourist spot with the famous Blue John caverns nearby.

IMGP5166


Paddington Station redevelopment

Datum dokončení: leden 2012

Paddington station in London is one of the capital's major transport hubs with 14 rail platforms and an important underground station. A new step free entrance to the underground station along with access to a new taxi drop off facility are being erected by Rowecord Engineering using TCB's. Main contractors are Carillion.

IMGP4312 resize


Blackfriars Bridge, London

Datum dokončení: září 2010

Watson Steel are taking on the demanding job of restrengthening Blackfriars Railway Bridge in the centre of London. When restrengthening work has been completed an impressive new station will be built across the length of the bridge. Delivering the steel to site is a logistical challenge. The site is next to a live railway with limited access by road. Watson Steel are having the steel delivered daily from the east end by barge.

IMGP2409 resize


White Horse Bridge, Wembley

Datum dokončení: listopad 2005

Always busy on F.A. Cup final day and for England home internationals, White Horse Bridge above Wembley stadium railway station is held together with 13,000 M24 & M30 TCBs. Named after the famous police horse associated with the first ever F.A. Cup final at Wembley back in 1923, the bridge was fabricated and erected by Cleveland Bridge UK.

P1010001